CCAR-P practice › Solution Design & Architecture · Question 5 of 110
Solution Design & Architecture · Select TWO
A legal team's pilot report claims a 70% time saving for a contract-review assistant, comparing the time Claude takes to produce a review with the time a lawyer took to review manually. The CFO asks whether the number will hold in production. Select two factors that must be included for a credible estimate.
Show answer and explanation
Answer: A and C — Lawyer time spent verifying and correcting each AI-produced review / The downstream cost of issues that slip through reviewed contracts
Fully loaded value counts the whole outcome: (a) review and correction time can cancel much of the saving, and (c) escaped errors carry rework and liability cost. (b) measures model speed, which was never the bottleneck. (d) is a generic proxy that says nothing about this team's contracts or workflow.
Keep going
More Solution Design & Architecture questions
- A marketplace search assistant must meet a contractual p95 latency limit with a partner…
- An invoice-extraction pipeline tested well, but in production about 15% of outputs are…
- Claude drafts refund decisions that a downstream system executes. Policy says refunds…
- A support-answer assistant collects thumbs-up/down ratings from agents. A dashboard…
- HR wants employees to ask questions about roughly 200 benefits policy documents…