CCAR-P practice › Solution Design & Architecture · Question 5 of 110

Solution Design & Architecture · Select TWO

A legal team's pilot report claims a 70% time saving for a contract-review assistant, comparing the time Claude takes to produce a review with the time a lawyer took to review manually. The CFO asks whether the number will hold in production. Select two factors that must be included for a credible estimate.

Show answer and explanation

Answer: A and C — Lawyer time spent verifying and correcting each AI-produced review / The downstream cost of issues that slip through reviewed contracts

Fully loaded value counts the whole outcome: (a) review and correction time can cancel much of the saving, and (c) escaped errors carry rework and liability cost. (b) measures model speed, which was never the bottleneck. (d) is a generic proxy that says nothing about this team's contracts or workflow.